Presentation on Preliminary Decommissioning Cost Estimating and Drivers
Katherine Moshonas Cole, General Manager at Candesco in Canada made this exclusive presentation on the topic of "Cost estimation for nuclear decommissioning – Identifying cost drivers".
The presentation included the following:
- Review/comparison of cost structures
- Comparison of decommissioning plans and the role of regulations, dismantling, waste characterization/disposal, and scheduling in driving costs
- Reducing costs through knowledge – Characterization, segmentation, disposition of materials
Download the full presentation for free here.
Please note: That all fields marked with an asterisk (*) are required.